Contract ServicesHome


SUPERSAFE™ TANK CONTRACT SERVICES

Delivered ready for site installation and immediate startup
Delivered ready for site installation and immediate startup

SuperSafe™ Cylindrically Diked© Tanks meet the requirements of 40CRF-112 and are delivered ready for site installation and immediate startup. There is no external dikeing requirement for the systems. NFPA-30 permits installation one half the diameter of the tank from an important structure, and vertical designs are available where space constraints make it more desirable.

SuperSafe™ Tanks can provide:

  • System CAD drawings,
  • Permitting assistance from local municipalities,
  • Development of SPCC requirements,
  • Site-specific engineering for soils testing, monitoring wells, concrete design and concrete installation,
  • Electrical layout and remote control circuitry,
  • Delivery, system installation, startup and training,
  • Very competitive equipment leasing terms with:
    • Two million dollars of pollution insurance,
    • Two million dollars of product liability insurance.
  • On going system inspections and routine maintenance
 

Company | Petroleum | Design | Standards | Systems | Selection | Safety | Solicitation
Cyclopentane | Contract | Trucks |
Warranty | Specs | Photos | Links | Contact

 

Copyright © 1999-2002 SuperSafeTM Tanks Inc.
Web and Graphic Design by Fortress Web Design